Case Introduction

When a brand - new laboratory door slowly opens, the first decontamination is just like laying the first safety cornerstone for the scientific research journey. Recently, the Biodeconta decontamination and purification team rushed to Changping and completed the crucial “first decontamination” for the new laboratory of a well - known domestic biopharmaceutical enterprise. Eventually, the decontamination effect accurately reached the lg6 level, using professional strength to safeguard the R & D safety of the client.

The cleanliness of a biopharmaceutical laboratory is directly related to the accuracy of experimental data, the safety of samples, and even the success or failure of subsequent drug R & D. And the first decontamination of a new laboratory is a key step in determining the aseptic environment benchmark for the entire space. It not only needs to eliminate the microbial contamination left over from construction but also needs to establish a stable and reliable aseptic foundation for future long - term experimental activities.

Click the link to watch the video:https://d.dolota.top/h5_preview/h5/video?short=eYpfAx&domain=www.duoleta.com/qrcode/api&sign=&chainId=389044&isAuthority=0